Vessels

Vessels

Nexus Floating Production Ltd has, based on turn-key contracts, ordered two complete advanced FPSO's from Samsung Heavy Industries   

Nexus 1 FPSO details

      

Nexus 2 FPSO details

Delivered July 2009 according to schedule.

The vessel is now sold. 

The vessel is put on hold until a customer is in place

The contract was signed mid 2006 and is constructed at
Samsung Yard in Geoje, South Korea.

Steel cutting commenced November 2007.
Keel Laying commenced May 2008.
Sea Launching commenced June 2008
Sea Trial commenced June 2009

The contract was signed mid 2007.

Nexus 2 FPSO is based on the same requirements as Nexus 1 FPSO.

General

  • The vessels meet the requirements of the most demanding operational conditions and regulatory requirements 
  • Designed for rapid deployment and sequential field development strategies
  • State of the art disconnectable turret mooring technology delivered by Advanced Production and Loading (APL)
  • Large storage capacity enables operations also in remote areas
  • Generic topside with flexibility to handle a wide range of production scenarios such as heavy oil, gas rich oil, gas to liquids, varying volumes etc.
  • Operation performed by BW Offshore
Main specifications for both vessels

 

Samsung Heavy Industries

Click for more information

More

Advanced Production and Loading

More

BW Offshore

More